Voorhees Township Board of EducationJan 23, 2023Documents

2023-2024 LRFP Working Copy

PDF · 2 pages · 51 KBFrom the Voorhees Township School Board Meeting January 23, 2023, agenda item 21.18 Long Range Facilities Plan.

Open the file

Summary

This is Voorhees Township's Long Range Facilities Plan (LRFP) for 2023-2028, listing planned building repairs and upgrades at each school over the next five years. It itemizes projects like replacing roofs, windows, doors, HVAC systems, security upgrades, solar panel installation, and a preschool expansion, along with estimated costs for each. The grand total for all planned work across the district is nearly $42 million, with the Middle School and Kresson School carrying the largest individual price tags.
Generated by Claude Sonnet 5

Raw text

The text of the document, as Citizen AI read it from the file. The file itself is the official copy.

Page 1
Voorhees Township Board of Educaon 2023-2028 LRFP Esmated Project Start Fiscal Year Units Price Total Hamilton School Replace Interior Doors 2021-2025 35 $ 2,000 $ 70,000 Replace Windows (energy saving insulated) 2021-2025 40 $ 5,000 $ 200,000 Replace HVAC units 2021-2025 30 $ 18,000 $ 540,000 Installaon of addional security systems 2021-2025 2 $ 100,000 $ 200,000 Installaon of fencing 2025 1 $ 300,000 $ 300,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Replace carpeng 2021-2025 20 $ 12,000 $ 240,000 Replace HVAC (computerized control system) 2023 25 $ 3,000 $ 75,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Replace metal roof 2025 1 $ 1,750,000 $ 1,750,000 Total $ 5,045,000 Kresson School Replace metal roof 2025 1 $ 5,200,000 $ 5,200,000 Replace Interior Doors 2021-2025 35 $ 2,000 $ 70,000 Replace HVAC units 2021-2025 25 $ 18,000 $ 450,000 Installaon of addional security systems 2021-2025 2 $ 100,000 $ 200,000 Replace Windows (energy saving insulated) 2021-2025 30 $ 5,000 $ 150,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Expansion to Maintenance Garage 2024 1 $ 150,000 $ 150,000 Replace carpeng 2021-2025 20 $ 12,000 $ 240,000 Replace HVAC (computerized control system) 2023 25 $ 3,000 $ 75,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Media Center Renovaons 2024 1 $ 250,000 $ 250,000 Total $ 8,455,000 Osage School Replace Interior Doors 2021-2025 40 $ 2,000 $ 80,000 Replace Windows (energy saving insulated) 2021-2025 10 $ 5,000 $ 50,000 Installaon of additonal security systems 2021-2025 2 $ 100,000 $ 200,000 Installaon of fencing 2025 1 $ 150,000 $ 150,000 Replace HVAC units 2021-2025 20 $ 18,000 $ 360,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Replace carpeng 2019-2024 20 $ 12,000 $ 240,000 Replace metal roof 2025 1 $ 1,750,000 $ 1,750,000 Replace HVAC (computerized control system) 2023 25 $ 3,000 $ 75,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Upgrade lighng to LED 2024 1 $ 250,000 $ 250,000 Total $ 4,825,000 Signal Hill Replace Interior Doors 2021-2025 20 $ 2,000 $ 40,000 Replace HVAC units 2021-2025 45 $ 18,000 $ 810,000 Replace Windows (energy saving insulated) 2021-2025 20 $ 5,000 $ 100,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Installaon of addional security systems 2021-2025 2 $ 100,000 $ 200,000 Reasphalt parking lot and driveway 2023 1 $ 300,000 $ 300,000 Playground equipment 2023 1 $ 300,000 $ 300,000 Replace carpeng 2019-2024 20 $ 8,000 $ 160,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Replace HVAC (computerized control system) 2024 45 $ 3,000 $ 135,000 Total $ 3,715,000 Middle School Replace Interior Doors 2021-2025 50 $ 2,000 $ 100,000 Installaon of addional security systems 2021-2025 3 $ 100,000 $ 300,000 Replace Windows (energy saving insulated) 2021-2025 30 $ 5,000 $ 150,000 Refurbish Student & Faculty Bathrooms 2021-2025 10 $ 15,000 $ 150,000 Replace HVAC units (School) 2021-2024 76 $ 20,000 $ 1,520,000 Replace glass blocks (Theater) 2023-2024 1 $ 50,000 $ 50,000 Upgrade House Lighng to LED (Theater) 2022-2024 1 $ 150,000 $ 150,000 Replace carpeng 2019-2024 40 $ 8,000 $ 320,000 Replace fencing and ballards 2021-2025 1 $ 350,000 $ 350,000 Solar 2025 1 $ 2,500,000 $ 2,500,000 Install FOB system 2024 1 $ 75,000 $ 75,000 Replace metal roof 2025 1 $ 2,500,000 $ 2,500,000 Replace HVAC (computerized control system) 2021-2025 5 wings $ 20,000 $ 100,000 Arficial Turf Athlec Fields 2025 1 $ 3,500,000 $ 3,500,000 Total $ 11,765,000 District-wide Preschool Expansion - Addional Classrooms 2023-2024 1 $ 7,000,000 $ 7,000,000 $ 7,000,000 Adm Building Convert to Municipal Water and Sewer 2025 1 $ 250,000 $ 250,000 Reasphalt parking lot 2025 1 $ 150,000 $ 150,000 Security camera installaon 2023 5 $ 8,000 $ 40,000 Install FOB system 2024 1 $ 25,000 $ 25,000 Reconfigure roof drainage 2023 1 $ 650,000 $ 650,000 Refurbish Bathrooms 2023 4 $ 10,000 $ 40,000 Total $ 1,155,000 Grand Total $ 41,960,000