PDF · 2 pages · 53 KBFrom the Voorhees Township School Board Meeting March 15, 2023, agenda item 20.16 Long Range Facilities Plan.

Open the file

Summary

This is Voorhees Township school district's 5-year facility wish list (called a Long Range Facilities Plan) covering 2023-2028. It lists building-by-building projects like new roofs, HVAC systems, windows, security upgrades, solar panels, and a preschool expansion, along with estimated costs for each. The total wish list adds up to about $53.2 million, though the document notes only about 60% (roughly $31.9 million) may actually move forward.
Generated by Claude Sonnet 5

Raw text

The text of the document, as Citizen AI read it from the file. The file itself is the official copy.

Page 1
Voorhees Township Board of Educaon 2023-2028 LRFP Esmated Project Start Fiscal Year Units Price Total Hamilton School Replace Interior Doors 2021-2025 35 $ 2,000 $ 70,000 Replace Windows (energy saving insulated) 2021-2025 40 $ 5,000 $ 200,000 Replace HVAC units 2021-2025 30 $ 18,000 $ 540,000 Installaon of addional security systems 2021-2025 2 $ 100,000 $ 200,000 Installaon of fencing 2025 1 $ 300,000 $ 300,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Replace carpeng 2021-2025 20 $ 12,000 $ 240,000 Replace HVAC (computerized control system) 2023 25 $ 3,000 $ 75,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Replace metal roof 2025 1 $ 1,750,000 $ 1,750,000 Total $ 5,045,000 Kresson School Replace metal roof 2025 1 $ 5,200,000 $ 5,200,000 Replace Interior Doors 2021-2025 35 $ 2,000 $ 70,000 Replace HVAC units 2021-2025 25 $ 18,000 $ 450,000 Installaon of addional security systems 2021-2025 2 $ 100,000 $ 200,000 Replace Windows (energy saving insulated) 2021-2025 30 $ 5,000 $ 150,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Expansion to Maintenance Garage 2024 1 $ 150,000 $ 150,000 Replace carpeng 2021-2025 20 $ 12,000 $ 240,000 Replace HVAC (computerized control system) 2023 25 $ 3,000 $ 75,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Media Center Renovaons 2024 1 $ 250,000 $ 250,000 Total $ 8,455,000 Osage School Replace Interior Doors 2021-2025 40 $ 2,000 $ 80,000 Replace Windows (energy saving insulated) 2021-2025 10 $ 5,000 $ 50,000 Installaon of additonal security systems 2021-2025 2 $ 100,000 $ 200,000 Installaon of fencing 2025 1 $ 150,000 $ 150,000 Replace HVAC units 2021-2025 20 $ 18,000 $ 360,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Replace carpeng 2019-2024 20 $ 12,000 $ 240,000 Replace metal roof 2025 1 $ 1,750,000 $ 1,750,000 Replace HVAC (computerized control system) 2023 25 $ 3,000 $ 75,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Upgrade lighng to LED 2024 1 $ 250,000 $ 250,000 Playground Upgrade & Site Preparaon 2023-2024 1 $ 582,000 $ 250,000 Total $ 5,075,000 Signal Hill Replace Interior Doors 2021-2025 20 $ 2,000 $ 40,000 Replace HVAC units 2021-2025 45 $ 18,000 $ 810,000 Replace Windows (energy saving insulated) 2021-2025 20 $ 5,000 $ 100,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Installaon of addional security systems 2021-2025 2 $ 100,000 $ 200,000 Reasphalt parking lot and driveway 2023 1 $ 300,000 $ 300,000 Playground equipment 2023 1 $ 300,000 $ 300,000
Page 2
Replace carpeng 2019-2024 20 $ 8,000 $ 160,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Install FOB system 2024 1 $ 50,000 $ 50,000 Replace HVAC (computerized control system) 2024 45 $ 3,000 $ 135,000 Total $ 3,715,000 Middle School Replace Interior Doors 2021-2025 50 $ 2,000 $ 100,000 Installaon of addional security systems 2021-2025 3 $ 100,000 $ 300,000 Replace Windows (energy saving insulated) 2021-2025 30 $ 5,000 $ 150,000 Refurbish Student & Faculty Bathrooms 2021-2025 10 $ 15,000 $ 150,000 Replace HVAC units (School) 2021-2024 76 $ 20,000 $ 1,520,000 Replace glass blocks (Theater) 2023-2024 1 $ 50,000 $ 50,000 Upgrade House Lighng to LED (Theater) 2022-2024 1 $ 150,000 $ 150,000 Replace carpeng 2019-2024 40 $ 8,000 $ 320,000 Replace fencing and ballards 2021-2025 1 $ 350,000 $ 350,000 Solar 2025 1 $ 2,500,000 $ 2,500,000 Install FOB system 2024 1 $ 75,000 $ 75,000 Replace metal roof 2025 1 $ 2,500,000 $ 2,500,000 Replace HVAC (computerized control system) 2021-2025 5 wings $ 20,000 $ 100,000 Arficial Turf Athlec Fields 2025 1 $ 3,500,000 $ 3,500,000 Total $ 11,765,000 District-wide Preschool Expansion - Addional Classrooms - Phase I 2023-2024 1 $ 11,000,000 $ 11,000,000 Preschool Expansion - Addional Classrooms - Phase 2 2024-2025 1 $ 7,000,000 $ 7,000,000 $ 18,000,000 Adm Building Convert to Municipal Water and Sewer 2025 1 $ 250,000 $ 250,000 Reasphalt parking lot 2025 1 $ 150,000 $ 150,000 Security camera installaon 2023 5 $ 8,000 $ 40,000 Install FOB system 2024 1 $ 25,000 $ 25,000 Reconfigure roof drainage 2023 1 $ 650,000 $ 650,000 Refurbish Bathrooms 2023 4 $ 10,000 $ 40,000 Total $ 1,155,000 Grand Total 60% $ 31,926,000 $ 53,210,000