Voorhees Township Board of EducationJun 12, 2023Documents

6.6.23 Resolution Authorizing Settlement Agreement with LAN

PDF · 2 pages · 93 KBFrom the Voorhees Township School Board Meeting June 12, 2023, agenda item 20.28 LAN Associates.

Open the file

Summary

This is a school board resolution approving a legal settlement between Voorhees Township Board of Education and LAN Associates, the architecture firm hired for a kindergarten classroom addition at Kresson Elementary School. During construction, a dispute arose over extra costs from a design change involving sewage ejector systems (equipment needed to properly pump wastewater into the sanitary sewer system) that had originally been planned, then removed, then needed again. Rather than pursue a legal fight, both sides agreed to a settlement to resolve the dispute and release each other from further claims. The resolution formally approves that settlement and authorizes district officials to sign the final paperwork.
Generated by Claude Sonnet 5

Raw text

The text of the document, as Citizen AI read it from the file. The file itself is the official copy.

Page 1
THE VOORHEES TOWNSHIP BOARD OF EDUCATION, IN THE COUNTY OF CAMDEN, NEW JERSEY RESOLUTION NO. 2023-____ RESOLUTION OF THE BOARD OF EDUCATION OF VOORHEES TOWNSHIP, IN THE COUNTY OF CAMDEN, NEW JERSEY, APPROVING OF SETTLEMENT AND MUTUAL RELEASE AGREEMENT. BACKGROUND WHEREAS, Lan Associates, Engineering, Planning, Architecture, Surveying, Inc. (“LAN”) was retained by Voorhees Township Board of Education (“Board”), as the Board’s Architect of Record, to provide A/E services for the Kindergarten Classroom Addition to Kresson Elementary School Project, located at 7 School Lane, Voorhees, NJ 08043 (hereinafter “Project”); and WHEREAS, the Board made claim to LAN that LAN should assume a portion of the increased costs associated with the design change during construction, to install Sewage Ejector Systems to assure proper up-flow into the existing sanitary system, which was initially planned but removed as part of Addendum #1 to the bid, and additional construction costs necessitated by that design change; and WHEREAS, LAN and the Board deem it to be in their mutual best interests to amicably resolve any disputes which may exist between them concerning the Sewage Ejector Systems work performed by LAN and its respective officers, agents, employees, and insurers; and WHEREAS, in consideration of promises and undertakings, and at the advice of Board counsel, the Board has determined and approved the terms of the proposed Settlement Agreement as adequate and reasonable, and in the best interests of the Board, and now desire to settle and release any claims against each other. NOW, THEREFORE, BE IT RESOLVED BY THE VOORHEES TOWNSHIP BOARD OF EDUCATION, IN THE COUNTY OF CAMDEN, NEW JERSEY, AS FOLLOWS: Section 1. The Board hereby authorizes and approves the Settlement and Mutual Release Agreement between the Board and LAN, which is attached hereto and incorporated herein. Section 2. The Board hereby authorizes the execution of all necessary settlement agreement documents, contingent upon review and approval by the Board’s Counsel.
Page 2
Section 3. This Resolution shall become effective immediately upon adoption this 12th day of June, 2023. Recorded Vote AYE NO ABSTAIN ABSENT The foregoing is a true copy of a resolution adopted by The Voorhees Township Board of Education, in the County of Camden, New Jersey on June 12, 2023. _____ HELEN HALEY Business Administrator/Board Secretary 4863-7716-3622, v. 2