FY 2022-2023 FY 2023-2024 FY 2024-2025
School Facility/ Number Actual Budgeted Planned
E. T. Hamilton Elementary School / 20 $ 240,847.00 $ 257,950.00 $ 263,109.00
Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls
Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles
Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines
Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment
Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof
Preventive Maintenance Preventive Maintenance Preventive Maintenance
Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions
Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches
Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers
Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment
Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained
Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained
Emergency Generators Emergency Generators Emergency Generators
Maintain Landscaping Maintain Landscaping Maintain Landscaping
Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware
Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System
Window and Door Replacement Window and Door Replacement Window and Door Replacement
Personal Protection Equipment Personal Protection Equipment Personal Protection Equipment
Replacement of Flooring in 11 classrooms Replacement of Flooring in 10 classrooms Replacement of Flooring in 10 classrooms
Kresson Elementary School / 55 $ 180,491.00 $ 210,450.00 $ 214,659.00
Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls
Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles
Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines
Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment
Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof
Preventive Maintenance Preventive Maintenance Preventive Maintenance
Doors/Windows Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers
Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches
Security Systems Tested Security Systems Tested Security Systems Tested
Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers
Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment
Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained
Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained
Emergency Generators Emergency Generators Emergency Generators
Maintain Landscaping Maintain Landscaping Maintain Landscaping
Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware
Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System
Window and Door Replacement Window and Door Replacement Window and Door Replacement
Personal Protection Equipment Personal Protection Equipment Personal Protection Equipment
Replacement of Flooring in 11 classrooms Replacement of Flooring in 10 classrooms Replacement of Flooring in 10 classrooms
Voorhees Middle School / 100 $ 347,790.00 $ 326,450.00 $ 332,979.00
Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls
Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles
Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines
Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment
Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof
Preventive Maintenance Preventive Maintenance Preventive Maintenance
Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers
Doors/Windows Doors/Windows Doors/Windows
Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches
Security Systems Tested Security Systems Tested Security Systems Tested
Refinish of Gym Floors Refinish of Gym Floors Refinish of Gym Floors
Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers
Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment
Page 2
Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained
Locker Maintenance and Repair Locker Maintenance and Repair Locker Maintenance and Repair
Emergency Generators Emergency Generators Emergency Generators
Maintain Landscaping Maintain Landscaping Maintain Landscaping
Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware
Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System
Window and Door Replacement Window and Door Replacement Window and Door Replacement
Personal Protection Equipment Personal Protection Equipment Personal Protection Equipment
Replacement of Flooring in 10 classrooms Replacement of Flooring in 10 classrooms Replacement of Flooring in 10 classrooms
Osage Elementary School / 90 $ 267,265.00 $ 284,950.00 $ 290,649.00
Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls
Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles
Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines
Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment
Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof
Preventive Maintenance Preventive Maintenance Preventive Maintenance
Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions
Doors/Windows Doors/Windows Doors/Windows
Boiler Inspections Boiler Inspections Boiler Inspections
Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches
Security Systems Tested Security Systems Tested Security Systems Tested
Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers
Cooling Tower Maintenance Cooling Tower Maintenance Cooling Tower Maintenance
Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment
Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained
Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained
Emergency Generators Emergency Generators Emergency Generators
Maintain Landscaping Maintain Landscaping Maintain Landscaping
Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware
Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System
Window and Door Replacement Window and Door Replacement Window and Door Replacement
Boiler Inspection and Maintence Boiler Inspection and Maintence Boiler Inspection and Maintence
Personal Protection Equipment Personal Protection Equipment Personal Protection Equipment
Replacement of Flooring in 11 classrooms Replacement of Flooring in 10 classrooms Replacement of Flooring in 10 classrooms
Signal Hill Elementary School / 95 $ 243,762.00 $ 246,950.00 $ 251,889.00
Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls
Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles
Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines
Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment
Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof
Preventive Maintenance Preventive Maintenance Preventive Maintenance
Doors/Windows Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers
Boiler Inspections Boiler Inspections Boiler Inspections
Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches
Security Systems Tested Security Systems Tested Security Systems Tested
Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers
Cooling Tower Maintenance Cooling Tower Maintenance Cooling Tower Maintenance
Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment
Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained
Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained
Emergency Generators Emergency Generators Emergency Generators
Maintain Landscaping Maintain Landscaping Maintain Landscaping
Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware
Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System
Window and Door Replacement Window and Door Replacement Window and Door Replacement
Boiler Inspection and Maintence Boiler Inspection and Maintence Boiler Inspection and Maintence
Personal Protection Equipment Personal Protection Equipment Personal Protection Equipment
Replacement of Flooring in 11 classrooms Replacement of Flooring in 10 classrooms Replacement of Flooring in 10 classrooms
Total $ 1,280,155.00 $ 1,326,750.00 $ 1,353,285.00