Voorhees Township Board of EducationMar 13, 2024Documents

2024-2025 LRFP Working Copy - 2024-2025 Working Copy - LRFP (1)

PDF · 2 pages · 69 KBFrom the Voorhees Township School Board Meeting March 13, 2024, agenda item 19.13 Long Range Facilities Plan.

Open the file

Raw text

The text of the document, as Citizen AI read it from the file. The file itself is the official copy.

Page 1
2024-2025 Working Copy - LRFP 2024-2025 2024-2029 LRFP Estimated Project Start Fiscal Year Units Price Total Hamilton School Replace Interior Doors 2024-2025 20 $ 2,000 $ 40,000 Replace Windows (energy saving insulated) 2024-2025 20 $ 5,000 $ 100,000 Replace HVAC units 2021-2025 30 $ 18,000 $ 540,000 Installation of additional security systems 2021-2025 2 $ 100,000 $ 200,000 Installation of fencing 2029 1 $ 300,000 $ 300,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Replace carpeting 2021-2025 10 $ 12,000 $ 120,000 Fire alarm system replacement 2024-2025 1 $ 470,000.00 $ 470,000 Solar 2029 1 $ 1,500,000 $ 1,500,000 Replace metal roof 2029 1 $ 1,750,000 $ 1,750,000 Total $ 5,140,000 Kresson School Replace metal roof 2029 1 $ 5,200,000 $ 5,200,000 Replace Interior Doors 2021-2025 35 $ 2,000 $ 70,000 Replace HVAC units 2021-2025 25 $ 18,000 $ 450,000 Installation of additional security systems 2021-2025 2 $ 100,000 $ 200,000 Replace Windows (energy saving insulated) 2024-2025 20 $ 5,000 $ 100,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Expansion to Maintenance Garage 2029 1 $ 150,000 $ 150,000 Replace carpeting 2021-2025 10 $ 12,000 $ 120,000 Fire alarm system replacement 2024-2025 1 $ 455,000.00 $ 455,000 Solar 2029 1 $ 1,500,000 $ 1,500,000 Total $ 8,365,000 Osage School Replace Interior Doors 2021-2025 27.5 $ 2,000 $ 55,000 Replace Windows (energy saving insulated) 2024-2025 10 $ 5,000 $ 50,000 Installation of additonal security systems 2021-2025 2 $ 100,000 $ 200,000 Installation of fencing 2025 1 $ 150,000 $ 150,000 Replace HVAC units 2021-2025 20 $ 18,000 $ 360,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Replace carpeting 2019-2024 10 $ 12,000 $ 120,000 Replace metal roof 2025 1 $ 1,750,000 $ 1,750,000 Fire alarm system replacement 2024-2025 1 $ 582,000.00 $ 582,000 Boiler replacement - ROD Grant Project 2025-2026 1 $ 1,440,000.00 $ 1,440,000 Solar 2029 1 $ 1,500,000 $ 1,500,000 Total $ 6,327,000 Signal Hill Replace Interior Doors 2021-2025 20 $ 2,000 $ 40,000 Replace HVAC units 2021-2025 45 $ 18,000 $ 810,000 Replace Windows (energy saving insulated) 2024-2025 10 $ 5,000 $ 50,000 Refurbish Student & Faculty Bathrooms 2021-2025 8 $ 15,000 $ 120,000 Installation of additional security systems 2021-2025 2 $ 100,000 $ 200,000 Reasphalt parking lot and driveway 2023 1 $ 300,000 $ 300,000 Playground equipment 2023 1 $ 300,000 $ 300,000 Replace carpeting 2019-2024 18.5 $ 8,000 $ 148,000 Fire alarm system replacement 2024-2025 1 $ 608,000.00 $ 608,000 Boiler replacement - ROD Grant Project 2025-2026 1 $ 1,497,000.00 $ 1,497,000 Solar 2025 1 $ 1,500,000 $ 1,500,000 Replace HVAC (computerized control system) 2024-2025 45 $ 6,667 $ 300,015
Page 2
2024-2025 Working Copy - LRFP Total $ 5,873,015 Middle School Replace Interior Doors 2021-2025 42.5 $ 2,000 $ 85,000 Installation of additional security systems 2021-2025 3 $ 100,000 $ 300,000 Replace Windows (energy saving insulated) 2021-2025 17 $ 5,000 $ 85,000 Refurbish Student & Faculty Bathrooms 2024-2025 1 $ 125,000 $ 125,000 Replace HVAC units (School) 2021-2024 76 $ 20,000 $ 1,520,000 Replace HVAC 2021-2025 5 wings $ 20,000 $ 100,000 Replace carpeting 2019-2024 25 $ 8,000 $ 200,000 Replace fencing and ballards 2021-2025 1 $ 350,000 $ 350,000 Solar 2029 1 $ 2,500,000 $ 2,500,000 HVAC Equipment - ROD Grant Project 2025-2026 1 $ 1,216,000 $ 1,216,000 Replace metal roof 2029 1 $ 2,500,000 $ 2,500,000 Re-configure existing entrance vestibule 2024-2025 1 $ 230,000 $ 230,000 Glass block replacement - Auditorium Lobby 2025-2026 1 $ 330,000 $ 330,000 Artificial Turf Athletic Fields 2029 1 $ 3,500,000 $ 3,500,000 Total $ 13,041,000 District-wide 250 Haddonfield-Berlin Road land acquisition and renovations to building for early childhood center (pre-k) 2024-2025 1 $ 7,000,000 $ 7,000,000 $ 7,000,000 Adm Building Convert to Municipal Water and Sewer 2024-2025 1 $ 250,000 $ 250,000 Reasphalt parking lot 2025 1 $ 150,000 $ 150,000 Reconfigure roof drainage 2029 1 $ 650,000 $ 650,000 Refurbish Bathrooms 2025-2026 4 $ 10,000 $ 40,000 Total $ 1,090,000 Grand Total ($ 46,836,015) Maximum Amount of Capital Reserve 60% ($ 28,101,609)