Summary

This is the Voorhees Township school district's building maintenance plan covering six schools: E.T. Hamilton, Kresson, Voorhees Middle School, Osage, Signal Hill, and the Early Childhood Development Center. It lists routine upkeep tasks (painting, HVAC, roof repairs, plumbing, security systems, playground and fire safety checks) plus some bigger projects like flooring and window replacements. Actual spending for 2025-2026 totaled $1,139,564, with $729,350 budgeted for 2026-2027 and $743,937 planned for 2027-2028. Voorhees Middle School had the highest costs each year, including $347,791 spent in 2025-2026.
Generated by Claude Sonnet 5

Raw text

The text of the document, as Citizen AI read it from the file. The file itself is the official copy.

Page 1
Voorhees Township Board of Education Comprehensive Maintenance Plan 2026 FY 2025-2026 FY 2026-2027 FY 2027-2028 School Facility/ Number Actual Budgeted Planned E. T. Hamilton Elementary School / 20 ($ 182,630.00) ($ 112,000.00) ($ 114,240.00) Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof Preventive Maintenance Preventive Maintenance Preventive Maintenance Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained Emergency Generators Emergency Generators Emergency Generators Maintain Landscaping Maintain Landscaping Maintain Landscaping Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System Window and Door Replacement Window and Door Replacement Repair/Replace Building Signage Masonry Work Kresson Elementary School / 55 ($ 194,511.00) ($ 104,500.00) ($ 106,590.00) Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof Preventive Maintenance Preventive Maintenance Preventive Maintenance Doors/Windows Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches Security Systems Tested Security Systems Tested Security Systems Tested Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers
Page 2
Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained Emergency Generators Emergency Generators Emergency Generators Maintain Landscaping Maintain Landscaping Maintain Landscaping Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System Security Hardware Upgrades Flagpole Maintenance Replacement of Flooring in classrooms Voorhees Middle School / 100 ($ 347,791.00) ($ 202,000.00) ($ 206,040.00) Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof Preventive Maintenance Preventive Maintenance Preventive Maintenance Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers Doors/Windows Doors/Windows Doors/Windows Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches Security Systems Tested Security Systems Tested Security Systems Tested Refinish of Gym Floors Refinish of Gym Floors Refinish of Gym Floors Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained Locker Maintenance and Repair Locker Maintenance and Repair Locker Maintenance and Repair Emergency Generators Emergency Generators Emergency Generators Maintain Landscaping Maintain Landscaping Maintain Landscaping Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System Fencing Installation Repair/Replace Building Signage Replacement of Flooring in classrooms Security Hardware Upgrades Flagpole Maintenance LED Lighting Update Update Main Office Vestibule Flooring Installation Osage Elementary School / 90 ($ 162,138.00) ($ 127,000.00) ($ 129,540.00) Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles
Page 3
Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof Preventive Maintenance Preventive Maintenance Preventive Maintenance Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions Replace Bathroom Fixtures & Partitions Doors/Windows Doors/Windows Doors/Windows Boiler Inspections Boiler Inspections Boiler Inspections Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches Security Systems Tested Security Systems Tested Security Systems Tested Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Cooling Tower Maintenance Cooling Tower Maintenance Cooling Tower Maintenance Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained Emergency Generators Emergency Generators Emergency Generators Maintain Landscaping Maintain Landscaping Maintain Landscaping Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System Boiler Inspection and Maintence Boiler Inspection and Maintence Boiler Inspection and Maintence Update Main Office Replacement of Flooring in classrooms Concrete & Asphalt Repair Security Hardware Upgrade Signal Hill Elementary School / 95 ($ 173,038.00) ($ 128,850.00) ($ 131,427.00) Paint Selected Rooms & Halls Paint Selected Rooms & Halls Paint Selected Rooms & Halls Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Replace Damaged Ceiling Tiles Repair Curbs & Paint Lines Repair Curbs & Paint Lines Repair Curbs & Paint Lines Maintain HVAC Equipment Maintain HVAC Equipment Maintain HVAC Equipment Repair & Inspect Roof Repair & Inspect Roof Repair & Inspect Roof Preventive Maintenance Preventive Maintenance Preventive Maintenance Doors/Windows Plumbing/Fixtures/Sprinklers Plumbing/Fixtures/Sprinklers Boiler Inspections Boiler Inspections Boiler Inspections Test and Flow Tamper Switches Test and Flow Tamper Switches Test and Flow Tamper Switches Security Systems Tested Security Systems Tested Security Systems Tested Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Replace Plumbing Fixtures / Flushometers Cooling Tower Maintenance Cooling Tower Maintenance Cooling Tower Maintenance Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Hot and Cold Kitchen Equipment Fire Extiguishers Maintained Fire Extiguishers Maintained Fire Extiguishers Maintained Playground Equipment Maintained Playground Equipment Maintained Playground Equipment Maintained
Page 4
Emergency Generators Emergency Generators Emergency Generators Maintain Landscaping Maintain Landscaping Maintain Landscaping Door Closures and Hardware Door Closures and Hardware Door Closures and Hardware Test Emergency Notification System Test Emergency Notification System Test Emergency Notification System Boiler Inspection and Maintence Boiler Inspection and Maintence Boiler Inspection and Maintence Update Main Office Replace Flooring in Gym Storage Room Replacement of Flooring in classrooms Voorhees Early Childhood Development Centerl / 300 ($ 79,456.00) ($ 55,000.00) ($ 56,100.00) Elevator Maintenance Elevator Maintenance Elevator Maintenance Burglar Alarm Maintain Landscaping Maintain Landscaping Security Systems Boiler Inspections Boiler Inspections General Maintenance General Maintenance General Maintenance Playground Maintenance Playground Maintenance/Inspection Preventative Maintenance Preventative Maintenance Fire Extinguishers Maintained Fire Extingushers Maintained Total ($ 1,139,564.00) ($ 729,350.00) ($ 743,937.00)